01Site preparation
Inspection coverage includes completion of topsoil removal and relevant preparation before controlled fill placement within the agreed scope.
Notify the team before the relevant stage is covered or work proceeds.
Preparation · test rolling where applicable
02Fill placement
Competent personnel provide full-time supervision during applicable earthwork operations, including placement of imported or onsite fill material.
Material source, proposed use and assessment requirements must be agreed.
Imported or onsite fill
03Compaction operations
Coverage includes compaction and addition or removal of moisture, with trenching and backfilling included where applicable to the engagement.
Coordinate the programme so required inspection and testing can occur.
Layer placement · moisture adjustment · compaction
04Field testing
Compaction testing may use the nuclear gauge method under AS 1289.5.8.1, with density-ratio assessment against the applicable laboratory reference.
Testing frequency, areas and acceptance criteria must be defined for the project.
Field density and density ratio